Beginning

A refurbishment of another National set, we had to ‘cut and shut’ the set to adjust for the reduced size of The Ambassadors Theatre which had reduced width and depth compared to the Dorfman where it originally opened.

Working closely with the designer and Production manager we optimised the layout to get the max we could leaving tight tolerances with the fabric of the building.