Singin’ in the Rain

Through Bowerwood Production Services- we built the stainless steel framed floor for the west end transfer of Singin’ in the Rain.

Then rebuilt the stainless steel framed floor for the tour- which obviously needs to go in and out on a regular 2 week basis. Using the same composite decking that was used in the Palace, we adapted the system to tour.

 

  • Bowerwood Production Services
  • West End/ Tour

«  |  »